Project Name: The replacement of the Tilden Road bridge, structure #0208-1.85
Contract Number: BR-0208-01.85-2019
Location: Troy Township
Construction Cost Estimate: $150,000.00
Bid Date: Not Available
Low Bid: Not Available
Contractor: Not Available
Bid Tab Pending
Final Contract Amount: TBD
Maintenance of Traffic: Traffic Detoured
Project Description: The removal of an existing twin CMP structure and replacemnt with single precast concrete box culvert.